Tag Archives: Peak Demand

Load Shedding and One Approach in CBAS

 

What is Load Shedding?As I’m sure you know, power companies charge a premium when a certain demand threshold is reached. Load shedding during high electrical demand periods is a good way to lower electrical consumption and avoid paying premium prices for exceeding peak demand limits. Metering or monitoring the load for the building will tell you when that threshold is nearing.

Load shedding will probably not work if the demand follows a bell curve during the day, where the threshold is exceeded for a good portion of the day. In this case, the building needs to find ways of increasing energy efficiency, either by purchasing more efficient equipment, eliminating waste, etc. However, if there is a peak in the demand curve that is exceeded around the same time everyday, load shedding could help. The question is, what can you afford to shut down without making people uncomfortable and angry? Continue reading Load Shedding and One Approach in CBAS